Find Transformer, 50Mva Transforme, Power Transformer on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
66 110 220kV Oil-immersed Power Transformer
Home > Products > Distribution Transformers > 66,110,220kV Distribution Transformers > 66 110 220kV Oil-immersed Power Transformer

66 110 220kV Oil-immersed Power Transformer

    Payment Type: L/C,T/T
    Min. Order: 2 Set/Sets
    Delivery Time: 45 Days
    Packaging: Bare
    Brand: SHFE
    Place of Origin: Shanghai, China (Mainland)
    Supply Ability: 6 Set/Sets per Month

Basic Info

Model No.: SF, SZ

Product Description

Specifications Economic or deluxe solution optional

Better cost performance

IEC Standards Criteria

New factory for better price

NVTC/ OLTC

REFERENCES   ISO 1461: Hot dip galvanized coatings on fabricated iron and steel articles – Specifications and test methods. IEC 60076: Power transformers. IEC 60044: Instrument transformers. IEC 60296: Specification for unused mineral insulating oil for transformers and Switchgear. IEC 60354: Loading guide for oil – immersed power transformers. IEC 60214: Tap-changers - Part 1: Performance requirements and test methods, Part 2: Application guide. IEC 60512: Connectors for electronic equipment.   Performance  
66kV Two-Winding Power Transformer With NVTC/OLTC
Rated Capacity (kVA) Rated Voltage (kV) Vector Group Losses (W)

Impedance Voltage

(%)

HV Tapping Range LV No load On load
630 63 66 69 ±5% 6.3 6.6 10.5 11 Yd11 1360 7560 8.0
800 1620 8830
1000 1920 10440
1250 2260 12340
1600 2720 14850
2000 3200 17550
2500 3760 20700
3150 YNd11 4480 24300
4000 5280 28800
5000 6240 32400
6300 ±2×2.5% 8000 36000 9.0
8000 9600 42750
10000 11360 50400
12500 13360 59850
16000 16080 73530
20000 19040 89100
25000 22480 105300
31500 26720 126900
40000 32000 148950
50000 37760 184500
63000 44880 222300
             
110kV Two-Winding Power Transformer With NVTC/OLTC

Rated

Capacity

 (kVA)

Rated Voltage (kV)

Vector

 Group

Losses (W)

Impedance

 Voltage

 (%)

HV

Tapping

 Range

LV No load On load
6300 110 121 ±2×2.5% 6.3 6.6 10.5 11 YNd11 8000 36900 10.5
8000 9600 45000
10000 11200 53100
12500 13200 63000
16000 16000 77400
20000 19000 93600
25000 22400 110700
31500 26700 133200
40000 31800 156600
50000 37600 194400
63000 44600 234000
 
110kV Three-Winding Power Transformer With   NVTC/OLTC

Rated

Capacity

 (kVA)

Rated Voltage (kV)

Vector

 Group

Losses (W) Impedance Voltage (%)
HV

Tapping

 Range

LV No load On load Step Up Step Down
6300

110 ±2×2.5%  

121 ±2×2.5%

35 38.5 ±2×2.5% 6.3 6.6 10.5 11 YNyn0d11 9600 47700

HV-MV 17-18

HV-LV 10.5

MV-LV 6.5

HV-MV 10.5

HV-LV 17-18 MV-LV 6.5

8000 11500 56700
10000 13600 66600
12500 16000 78300
16000 19300 95400
20000 22800 112500
25000 27000 133200
31500 32000 157500
40000 38200 189000
50000 45200 225000
63000 53600 270000
 
220kV Two-Winding Power Transformer With NVTC/OLTC

Rated

 Capacity

 (kVA)

Rated Voltage

 (kV)

Vector

Group

Losses (W)

Impedance

 Voltage

 (%)

HV LV No load On load
31500 220 ±2×2.5%  6.3 YNd11 29000 135000 12-14
40000 6.6 35000 158000
50000 10.5 41000 189000
63000 11 49000 221000
90000 10.5 65000 288000
120000 13.8 11 80000 347000
150000 11 96000 405000
180000 13.8 109000 459000
240000 15.75 136000 567000
300000 15.75 160000 675000
360000 18 184000 774000
 
220kV Three-Winding Power Transformer With   NVTC/OLTC

Rated

Capacity

 (kVA)

Rated Voltage

 (kV)

Vector

 Group

Losses (W)

Impedance

 Voltage (%)

Capacity

Arrange

(%)

HV MV LV No load On load Step Up Step Down
31500

220

±2×2.5% 

69

121

6.3

 6.6

YNyn0d11 34000 162000

HV-MV 22-24

HV-LV 12-14

MV-LV 7-9

HV-MV 12-14

HV-LV

 22-24

MV-LV

7-9

100/100/100

100/50/100

100/100/50

40000

10.5

 11

40000 189000
50000 35 48000 225000
63000 38.5 56000 261000
90000

10.5

 11

13.8

73000 351000
120000

35

38.5

90000 432000
150000

11  

 13.8

106000 513000
180000

15.75 

  35

121000 585000
240000 38.5 149000 720000
   ROUTINE TEST to IEC 60076 (to be done during acceptance testing at factory)   • Measurement of winding resistance • Ratio test • Vector group • Separate source voltage withstand test • Induced over-voltage • Insulation resistance • Oil leakage test on fully assembled transformer for 12 hours • Measurement of impedance voltage • Magnetic balance • Measurement of no-load loss and current • Measurement of load loss (at normal & extreme taps) • Tests on on-load tap-changer • Tests on on-load tap-changer remote control panel • Efficiency at 50%, 75%, 100% loading at unity p.f and rated terminal voltage (Corrected to 75C) • Lightning impulse withstand test   Type Tests to IEC 60076 (to be done during acceptance testing at factory)   • Temperature rise test – To be performed on one unit during acceptance testing. Lightning Impulse Withstand Test is already listed under Routine Tests as per IEC 60076.      Test Facility

Contact us if you need more details on 110kv Power Transformer. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Power Transformer、220kv Power Transformer. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Distribution Transformers > 66,110,220kV Distribution Transformers